Coleskop and Umsobomvu Infrastructure Basic Assessments

COLESKOP INFRASTRUCTURE BASIC ASSESSMENT

Coleskop Wind Power (Pty) Ltd., a subsidiary of EDF Renewables (Pty) Ltd., (the Applicant) is proposing the development of infrastructure, associated with the Coleskop Wind Energy Facility (WEF), near Noupoort and Middelburg in the Pixley Ka Seme District Municipality (Northern Cape Province) and the Chris Hani District Municipality (Eastern Cape Province).

The proposed Coleskop Infrastructure Development includes the following:

  • New access point and access road route for the Coleskop WEF;
  • The construction of three (3) concrete batching plants, temporary laydown areas and construction areas;
  • The construction of electrical infrastructure which includes an OMS building; and
  • Two (2) 500 m corridors for the construction of a 132 kV overhead line, which will be routed from the Coleskop Substation to the MTS Substation. This will include a double circuit, twin Tern 132 kV conductor.

UMSOBOMVU INFRASTRUCTURE BASIC ASSESSMENT

Umsobomvu Wind Power (Pty) Ltd., a subsidiary of EDF Renewables (Pty) Ltd., (the Applicant) is proposing the development of infrastructure, associated with the Umsobomvu I Wind Energy Facility (WEF), near Noupoort and Middelburg in the Pixley Ka Seme District Municipality (Northern Cape Province) and the Chris Hani District Municipality (Eastern Cape Province).

The proposed Umsobomvu Infrastructure Development includes the following:

  • Create a new access point and access road route for Umsobomvu I WEF;
  • The construction of two (2) batching plants;
  • The construction of internal overhead lines with a 33 kV switching station of 20 m x 20 m; and
  • The construction of a collector substation.

Published: 6 June 2019
Review Period: 10th June – 12th July 2019

Contact Person: Caroline Evans