Mulilo Newcastle Wind Power (Pty) Ltd (hereafter referred to as the “Applicant”) plans to develop the Mulilo grid connection in Newcastle, KwaZulu-Natal Province. The proposed Mulilo Newcastle Wind Power (MNWP) Grid Connection project includes a 132 kV onsite switching station and a single or double circuit 132 kV overhead transmission line with a total length of up to approximately 21 km (for the preferred alternative) connecting to an existing Substation near Newcastle. The proposed Mulilo Newcastle Wind Power Grid Connection and associated infrastructure is required to supplement the development of the authorised MNWP Wind Energy Facility (WEF) (DFFE Ref: 14/12/16/3/3/2/2457).
The Applicant is proposing an amendment to the current layout of the authorised grid connection Overhead Line (OHL) and its associated corridors, inclusive of additional conditions to the current EA which was issued on 11 October 2024 (EDTEA Ref: DC25/0003/2024).
Date Published: 29 January 2026
Review Period: Not applicable
Public Participation Information:
Submission of the Final Part 2 Amendment Report. Documents can be downloaded from the CES webpage.
Contact Person: Ms. Tamera Pillay
E-mail address: reppp@cesnet.co.za